The current report presents the key messages of the FLEXNET project. The overall objective of the FLEXNET project was to analyse demand and supply of flexibility in the power system of the Netherlands up to 2050 at both the national and regional level. The current report is based on the summaries of the three extensive background reports of FLEXNET, each covering one of the three phases of the project. These phases include (i) the demand for flexibility (phase 1), (ii) the supply of flexibility (phase 2), and (iii) societal framework to trade off grid reinforcements versus deployment of flexibility (phase 3).
Demand and supply of flexibility in the power system of the Netherlands, 2015-2050. Key Messages
Downloads
Flexnet key messages - Demand and supply of fexibility in NL 2015-2050 - ECN E17063 (Last update: 2018-11-21 14:21:28)
Additional information
Author(s) | Sijm, J.P.M. Gockel, P. Welle, A.J. van der Westering, W. van |
Published by | ECN Policy Studies |
Report number | ECN-E--17-063 |
Document type | ECN publication |
Number of pages | 18 |
Full text | not-available |