Demand and supply of flexibility in the power system of the Netherlands, 2015-2050. Key Messages

Authors: Sijm, J.P.M. Gockel, P. Welle, A.J. van der Westering, W. van
Related subjects:
Downloads

Download Icon Flexnet key messages - Demand and supply of fexibility in NL 2015-2050 - ECN E17063 (Last update: 2018-11-21 14:21:28)

The current report presents the key messages of the FLEXNET project. The overall objective of the FLEXNET project was to analyse demand and supply of flexibility in the power system of the Netherlands up to 2050 at both the national and regional level. The current report is based on the summaries of the three extensive background reports of FLEXNET, each covering one of the three phases of the project. These phases include (i) the demand for flexibility (phase 1), (ii) the supply of flexibility (phase 2), and (iii) societal framework to trade off grid reinforcements versus deployment of flexibility (phase 3).

Additional information

Author(s) Sijm, J.P.M. Gockel, P. Welle, A.J. van der Westering, W. van
Published byECN Policy Studies
Report numberECN-E--17-063
Document typeECN publication
Number of pages18
Full textnot-available

Additional material